|
Clean out the rain gutters and downspouts. Insert the clips to the front of the MaxProtek® (2 clips per piece of 1 meter).
|
|
 |
|
 |
|
Position the MaxProtek® on the rain gutter, the flexible part showing to the building.
Press the clips on the front of the rain gutter.
|
|
 |
|
 |
 |
|
Overlap the MaxProtek® pieces.
Make sure that the 2 flexible strips are pressed
against one another, leaving no space between them.
|
|
 |
|
|
Make sure that the 2 pieces overlap perfectly.
If necessary insert a screw directly into
the perforated area (screws are not included).
|
|
 |
|
 |

|
Cut the sections at a 45° angle following the perforation line. Overlap sections by 25 mm.
|
 |
|
|
Top |