Home About us Contact Deutsch Français
 
 

 
Clean out the rain gutters and downspouts.
Insert the clips to the front of the MaxProtek®
(2 clips per piece of 1 meter).
Profil de gouttière
 
Position the MaxProtek® on the rain gutter, the flexible part showing to the building.
Press the clips on the front of the rain gutter.
Embout de gouttière
 
Overlap the MaxProtek® pieces.
Make sure that the 2 flexible strips are pressed
against one another, leaving no space between them.
Embout de gouttière
 
Make sure that the 2 pieces overlap perfectly.
If necessary insert a screw directly into
the perforated area (screws are not included).
Protège-gouttière qui ne se chevauche pas



Cut the sections at a 45° angle
following the perforation line.
Overlap sections by 25 mm.
 
Top
 
 
HOME  |   BENEFITS  |   INSTALLATION  |   FAQ  |   SPECIFICATIONS  |   FIND OUR PRODUCTS  |   ABOUT ALU-REX